This information applies to pages in the CSUN template system.Windows-press ALT + an access key. Macintosh-press CTRL + an access key.
Boeing DOE 100kW CPV POM
Construction :
Proof of Manufacturing for
triple junction concentrated
Solar Photovoltaic system.
Jan 2010 - May 2010
DOE grant funded Boeing CPV development project.
100kW of grid connected CPV demonstration project
Project management and installation by CSUN Facility team.
Subtropical Rainforest
Construction :
Waste Water Utilization for
Irrigation:
CO2 Utilization:
May 2008 - May 2009
9,000+ Gallons Per Day from Fuel Cell & Chiller Plant
Fuel Cell CO2 Byproduct for Rainforest CO2 Enrichment
(& Optimal Sequestration).
Satellite Chiller Plant
Construction :
Energy Utilization:
Cooling Capacity:
Heat Recovery:
Efficiency:
January 2008 - May 2009
Powered by the Fuel Cell
2,000 Tons
AC Reject Heat Used to Sustain Rainforest.
0.62 to 0.78kW/Ton
1 MW Fuel Cell
Construction :
CO2 Avoidance:
Total Project Electrical
Output:
Heat Recovery:
April 2006 - January 2007
6,400 Tons per MW / year
1 MW
220,000 Therms per Year
B2 Photovoltaic Project
Construction :
Total Project Cost:
Total Electrical Output:
Annual Electrical Output:
% Total Campus Electrical
March 2003 - February 2005
$3,457,874.64
467 kW
610,000 kWh/year
E6 Photovoltaic Project
Construction :
Total Project Cost:
Total Electrical Output:
Annual Electrical Output:
% Total Campus Electrical
June 2002 - March 2003
$1,971,318.07
225 Kw
275,000 kWh/year
Micro Turbine Installation
Construction :
Total Electrical Output:
Heat Recovery:
% Total Campus Electrical
Consumption:
July 2001 - October 2001
30kW per Micro Turbine 180kW Total
26,000 Therms per Year
3%